Brazil’s intention to further develop its solar power sector in this year’s solar auctions recalls an important lesson of Projects 101: an allocated risk is not necessarily a mitigated risk. In this article, partner Kevin S. Levey and associate Sarah M. Farnham discuss the critical points to address in anticipation of the solar auction in August and the solar and wind auction in November.
Article originally appeared in Solar Power World. Reprinted with permission.